Fees and resourcing on design and construction projects
This article needs more work. To help develop this article, click 'Edit this article'.
Contents |
[edit] Calculation
Fees can have impact on client's perception of a company and so it is important to get them right.
They can be based on:
- Empirical data: practice records of previous costs.
- Calculating the cost of the resource and other requirements (renders,printing, travel etc…) of the project on stage by stage basis.
- A tool such as the RIBA fee calculator based on the cost of the resource and other requirements.
[edit] Types of fee
Fees calculated as a percentage of the final construction cost:
- Suits straightforward building projects of relatively short duration.
- Can appear to reward design consultants for an overpriced design.
- Risk to the consultants that the construction cost could be lower than anticipated.
- Can be used as a basis for fee calculation rather than a 'set in stone' agreement.
- Appropriate when the scope of the project/ required services/ programme and cost clearly defined from outset and are unlikely to change.
- It is possible to agree lump sum separately for each work stage.
- Variations may allow additional fees.
Time charges:
- Appropriate when resources or time scale cannot be predicted accurately. This is often the case in the early stages of a project.
- An agreed hourly rate per staff category / named individual.
- May include a provision for increases with inflation (12 monthly).
Additional fees:
- Standard appointments generally have provision for additional fees.
- Beware of bespoke appointments that limit additional fees to client instructions.
- Licence fees for the design if the developer uses it on other sites.
[edit] Risks and uncertainties
- Client experience/ knowledge/ reputation/relationship. It may be appropriate to carry out a credit check and speak to other firms to find out how quickly they pay/ whether they observe payment terms and so on.
- Project definition: Are the requirements clear or uncertain?
- Scale of project: Impacts planning timescales/ resource/ programme.
- Complexity of the project.
- Whether similar work has been done before.
- Programme: scale/ planning/ resource/ uncertainties such as repairs for survey/squatters.
- Other resource requirements: if a project is overseas, it may be appropriate to work with a local consultant to benefit from their knowledge.
- Local opposition/support
- Requirement to appoint sub-consultants
[edit] Key influences on resource requirements
- Type of procurement and scope of services.
- Speed
- Quality
- Project size
- Complexity
- Extent of works to existing buildings
- Repair / conservation of historic buildings
- Degree of design repetition
- Practice size and overheads
- Geographic proximity
- BIM
[edit] Benefits
- Business expansion.
- Enhanced profit.
- Employ existing staff
- New market/sector
- Quality of work
- Prestige/enhanced reputation
[edit] Key influences on brand value
- Practice reputation.
- Location.
- Culture.
- Specialist skills.
[edit] Context/benchmarking
Whilst using the points above to aid a resource-based approach to calculate feed, cross-checks are recommended to ensure that a sensible outcome has been reached. Such checks include comparing the fee to be proposed against previous similar jobs and benchmarking the proposed fee against other projects when expressed as a percentage of construction cost.
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.