Fees and resourcing on design and construction projects
This article needs more work. To help develop this article, click 'Edit this article'.
Contents |
[edit] Calculation
Fees can have impact on client's perception of a company and so it is important to get them right.
They can be based on:
- Empirical data: practice records of previous costs.
- Calculating the cost of the resource and other requirements (renders,printing, travel etc…) of the project on stage by stage basis.
- A tool such as the RIBA fee calculator based on the cost of the resource and other requirements.
[edit] Types of fee
Fees calculated as a percentage of the final construction cost:
- Suits straightforward building projects of relatively short duration.
- Can appear to reward design consultants for an overpriced design.
- Risk to the consultants that the construction cost could be lower than anticipated.
- Can be used as a basis for fee calculation rather than a 'set in stone' agreement.
- Appropriate when the scope of the project/ required services/ programme and cost clearly defined from outset and are unlikely to change.
- It is possible to agree lump sum separately for each work stage.
- Variations may allow additional fees.
Time charges:
- Appropriate when resources or time scale cannot be predicted accurately. This is often the case in the early stages of a project.
- An agreed hourly rate per staff category / named individual.
- May include a provision for increases with inflation (12 monthly).
Additional fees:
- Standard appointments generally have provision for additional fees.
- Beware of bespoke appointments that limit additional fees to client instructions.
- Licence fees for the design if the developer uses it on other sites.
[edit] Risks and uncertainties
- Client experience/ knowledge/ reputation/relationship. It may be appropriate to carry out a credit check and speak to other firms to find out how quickly they pay/ whether they observe payment terms and so on.
- Project definition: Are the requirements clear or uncertain?
- Scale of project: Impacts planning timescales/ resource/ programme.
- Complexity of the project.
- Whether similar work has been done before.
- Programme: scale/ planning/ resource/ uncertainties such as repairs for survey/squatters.
- Other resource requirements: if a project is overseas, it may be appropriate to work with a local consultant to benefit from their knowledge.
- Local opposition/support
- Requirement to appoint sub-consultants
[edit] Key influences on resource requirements
- Type of procurement and scope of services.
- Speed
- Quality
- Project size
- Complexity
- Extent of works to existing buildings
- Repair / conservation of historic buildings
- Degree of design repetition
- Practice size and overheads
- Geographic proximity
- BIM
[edit] Benefits
- Business expansion.
- Enhanced profit.
- Employ existing staff
- New market/sector
- Quality of work
- Prestige/enhanced reputation
[edit] Key influences on brand value
- Practice reputation.
- Location.
- Culture.
- Specialist skills.
[edit] Context/benchmarking
Whilst using the points above to aid a resource-based approach to calculate feed, cross-checks are recommended to ensure that a sensible outcome has been reached. Such checks include comparing the fee to be proposed against previous similar jobs and benchmarking the proposed fee against other projects when expressed as a percentage of construction cost.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.